Discuss the relationship between the Waterfall model, work breakdown structure (WBS), RACI chart, scheduling and cost, when a decision has been made to migrate to the Cloud.
Discuss the relationship between the Waterfall model, work breakdown structure (WBS), RACI chart, scheduling and cost, when a decision has been made to migrate to the Cloud.
1. No Plagiarism at any cost as the assignment is attached to safe assign.
2. The submission date is Saturday (22/2/20).
3. The solution document should be 1 page and entirely in APA formatting.
4. Atleast 3 references in APA format
